Location: El Progreso, Honduras
Size: 80,000 sq ft
Client: Emergent Engineers
Year Completed: 2015
Location: El Progreso, Honduras
Size: 80,000 sq ft
Client: Emergent Engineers
Year Completed: 2015
In 2013 Emergent Engineers contacted GRANT to collaborate on a project in El Progresso, Honduras which included the design of a new dormitory, demolition of an existing facility, and the addition of a drainage system to combat the areas high rainfall in monsoon season. The project required collaborating with an international team of surveyors and contractors in order to obtain as-built topographic and building information and working closely with the owner of the mission to understand their needs. GRANT provided the client with a grading plan which minimized the requirement for any fill, included a new curtain drain system, and new driveway and parking area.